Inventors list |
Assignees list |
Classification tree browser |
Top 100 Inventors |
Top 100 Assignees |
Jose Pablo
Jose Pablo Cortina Cordero, Mexico MX
| Patent application number | Description | Published |
|---|---|---|
| 20100139181 | METHOD FOR MOUNTING IN SECTIONS AN ANNULAR TOWER FOR WIND POWER GENERATOR, HELIOSTATIC POWER GENERATOR OR CHIMNEY COMPOSED FROM THREE CONCRETE SEGMENTS OR MORE - A method for erecting a pre-stressed sectionalized and segmented concrete tower for wind power or heliostatic generator or chimney comprising the steps of (a) building a tower foundation; (b) fabricating a plurality of concrete segments having internal ducts for introducing pre-stressing tendons; (c) fabricating a plurality of assembling supports and lifting harnesses for proving a support to the concrete segments when assembled in tower sections; (d) installing, with a crane the concrete segments to conform the concrete tower section; (e) engaging a lifting harness to the concrete tower section, lift the whole section of tower, mount such concrete section on the foundation and disengage the lifting harness and/or the assembling support; (f) assembling the following concrete tower sections though the use of assembling supports and mounting such tower sections through the use of lifting harnesses; and (g) joining the concrete sections through prestressing tendons to provide a rigid tower. | 06-10-2010 |
Jose Pablo Cortina-Cordero, Col. Paseo De Las Lomas MX
| Patent application number | Description | Published |
|---|---|---|
| 20110299937 | PRE-STRESSED CONCRETE FOUNDATION FOR A MARINE BUILDING STRUCTURE - A pre-stressed marine foundation includes a concrete base to be placed on a sea bed, a body placed over the concrete base, and a concrete platform. The body includes closed sections, each closed section composed of a pre-stressed concrete segmented column that has an upper extreme and a lower extreme joined at the base, and opened sections joined at sides of the closed sections, each open section composed of a structured beam frame. The concrete platform is joined at the upper extremes of the concrete columns. | 12-08-2011 |
Jose Pablo Cortina Ortega, Mexico MX
| Patent application number | Description | Published |
|---|---|---|
| 20100139181 | METHOD FOR MOUNTING IN SECTIONS AN ANNULAR TOWER FOR WIND POWER GENERATOR, HELIOSTATIC POWER GENERATOR OR CHIMNEY COMPOSED FROM THREE CONCRETE SEGMENTS OR MORE - A method for erecting a pre-stressed sectionalized and segmented concrete tower for wind power or heliostatic generator or chimney comprising the steps of (a) building a tower foundation; (b) fabricating a plurality of concrete segments having internal ducts for introducing pre-stressing tendons; (c) fabricating a plurality of assembling supports and lifting harnesses for proving a support to the concrete segments when assembled in tower sections; (d) installing, with a crane the concrete segments to conform the concrete tower section; (e) engaging a lifting harness to the concrete tower section, lift the whole section of tower, mount such concrete section on the foundation and disengage the lifting harness and/or the assembling support; (f) assembling the following concrete tower sections though the use of assembling supports and mounting such tower sections through the use of lifting harnesses; and (g) joining the concrete sections through prestressing tendons to provide a rigid tower. | 06-10-2010 |
Jose Pablo Cortina-Ortega, Paseo De Las Lomas MX
| Patent application number | Description | Published |
|---|---|---|
| 20110308186 | FLANGE FOR WIND POWER GENERATORS - In a flange to adapt a wind power generator to a pre-stressed concrete tower, the flange includes an annular tapered pre-stressed concrete shell having a bulging which inwardly protrudes toward a central axis of the flange, and a steel component to be embedded within the pre-stressed concrete shell. The bulging includes a horizontal flat surface for settling the steel component. The steel component includes an annular tapered body having an upper and lower end, a plurality of vertical and radially extended fins joined to an external face of the steel component, a connecting ring joined to the body upper end and including a plurality of holes for introducing bolts to join the wind power generator, and an annular base joined to the body lower end, which is settled on the bulging. | 12-22-2011 |
Jose Pablo Cortina-Ortega, Col. Paseo De Las Lomas MX
| Patent application number | Description | Published |
|---|---|---|
| 20110299937 | PRE-STRESSED CONCRETE FOUNDATION FOR A MARINE BUILDING STRUCTURE - A pre-stressed marine foundation includes a concrete base to be placed on a sea bed, a body placed over the concrete base, and a concrete platform. The body includes closed sections, each closed section composed of a pre-stressed concrete segmented column that has an upper extreme and a lower extreme joined at the base, and opened sections joined at sides of the closed sections, each open section composed of a structured beam frame. The concrete platform is joined at the upper extremes of the concrete columns. | 12-08-2011 |
Jose Pablo Diaz Jimenez, Sitges ES
| Patent application number | Description | Published |
|---|---|---|
| 20110108037 | ENHANCEMENTS INTRODUCED INTO PROLONGED TRACHEAL CANNULATION PROCESSES - Consists of positioning, through the orifice or tracheostoma - | 05-12-2011 |
Jose Pablo Ruiz Minguela, Zamudio ES
| Patent application number | Description | Published |
|---|---|---|
| 20090322080 | INSTALLATION AND METHOD FOR HARNESSING WAVE ENERGY - Installation for harnessing wave energy, comprising a floating structure ( | 12-31-2009 |
