| Patent application number | Description | Published |
| 20080210422 | Reservoir Stimulation While Running Casing - A method for stimulating a reservoir formation while running a casing string into the wellbore includes the steps of: connecting a stimulation assembly to a casing string, the stimulation assembly including a packer actuator in operational connection with a packer and a logging sensor; running the casing string into the wellbore and positioning the logging assembly proximate to a selected reservoir formation; logging the reservoir formation; positioning the stimulation assembly proximate to the reservoir formation; actuating the packer to substantially isolate the reservoir formation from the wellbore; performing the stimulation operation; releasing the packers from sealing engagement with the wellbore; positioning the logging assembly proximate to the reservoir formation; logging the reservoir formation; and disconnecting the stimulation assembly from the casing string. | 09-04-2008 |
| 20090000786 | METHODS OF PRODUCING FLOW-THROUGH PASSAGES IN CASING, AND METHODS OF USING SUCH CASING - Methods of making and using wellbore casing are described, one method comprising providing a plurality of flow-through passages in a portion of a casing while the casing is out of hole; temporarily plugging the flow-through passages with a composition while out of hole; running the casing in hole in a wellbore intersecting a hydrocarbon-bearing formation; and exposing the composition to conditions sufficient to displace the composition from the flow-through passages while in hole. Methods of using the casing may include pumping a stimulation treatment fluid through the casing string and into a formation through the flow-through passages in the first casing joint; plugging the flow-through passages in the first casing section; and exposing a second casing joint of the casing string to conditions sufficient to displace the composition from the flow-through passages in the second casing joint. | 01-01-2009 |
| 20090114386 | SYSTEMS AND METHODS FOR DISTRIBUTED INTERFEROMETRIC ACOUSTIC MONITORING - This disclosure relates in general to a method and system for monitoring a conduit, a wellbore or a reservoir associated with hydrocarbon production or transportation and/or carbon dioxide sequestration. More specifically, but not by way of limitation, embodiments of the present invention provide for using an optical fiber as a distributed interferometer that may be used to monitor the conduit, wellbore or reservoir. In certain aspects, the distributed interferometric monitoring provides | 05-07-2009 |
| 20090145660 | METHOD AND SYSTEM FOR FRACTURING SUBSURFACE FORMATIONS DURING THE DRILLING THEREOF - A method for fracturing a wellbore while drilling a wellbore includes inserting a drill string into a wellbore. A fluid is pumped into at least one of an interior passage in the drill string and an annular space between a wall of the wellbore and the drill string. At least one of a pressure and a temperature of the fluid proximate a lower end of the drill string is measured and the measurements are transmitted to the surface substantially contemporaneously with the measuring. At least one of a flow rate and a pressure of the fluid is controlled in response to the measurements to selectively create fractures in formations adjacent to the wellbore. | 06-11-2009 |
| 20090151938 | STIMULATION THROUGH FRACTURING WHILE DRILLING - A method for preparing a formation surrounding a wellbore to bear hydrocarbons through a borehole is disclosed. In one step, a bottomhole assembly is inserted into the borehole. The formation is drilled with the bottomhole assembly. The formation may be characterized with logging tools, probes, sensors, seismic system and/or the like to create first information. One or more fractures are placed in the formation without removal of the bottomhole assembly from the wellbore. Further, continuous drilling of the formation is performed with the bottomhole assembly after/during placing the fractures. Further characterizing of the formation with the probes, sensors/systems or the like is performed to produce second information. Another fracture is placed with feedback from the second information. Repeating the drilling, characterizing and placing of fractures as necessary during the formation preparing process. | 06-18-2009 |
| 20090286700 | Heterogeneous Proppant Placement in a Fracture with Removable Channelant Fill - A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant ( | 11-19-2009 |
| 20100006293 | FRACTURING METHOD FOR SUBTERRANEAN RESERVOIRS - A method of creating multiple fractures in a well traversing a formation is described using pressurized fluids in a highly deviated or horizontal section of the well at a pressure above the fracturing pressure of the formation, wherein for creating a fracture the pressurized fluid is alternated between an acid fracturing fluid and a proppant loaded fluid, such that the proppant blocks the flow of pressurized fluid into a fracture created during a previous step of the method and the subsequently pressurized acid fracturing fluid creates a new fracture at a location along the highly deviated or horizontal section different from the location of the previously created fracture. | 01-14-2010 |
| 20110005754 | METHODS OF PRODUCING FLOW-THROUGH PASSAGES IN CASING, AND METHODS OF USING SUCH CASING - Methods of making and using wellbore casing are described, one method comprising providing a plurality of flow-through passages in a portion of a casing while the casing is out of hole; temporarily plugging the flow-through passages with a composition while out of hole; running the casing in hole in a wellbore intersecting a hydrocarbon-bearing formation; and exposing the composition to conditions sufficient to displace the composition from the flow-through passages while in hole. Methods of using the casing may include pumping a stimulation treatment fluid through the casing string and into a formation through the flow-through passages in the first casing joint; plugging the flow-through passages in the first casing section; and exposing a second casing joint of the casing string to conditions sufficient to displace the composition from the flow-through passages in the second casing joint. | 01-13-2011 |