Patent application number | Description | Published |
20130079896 | METHOD AND SYSTEM FOR GENERATING AN INTEGRATION MODEL - Exemplary systems and methods are directed to automated performance of a plant process in a control system included in a production management system. The control system including a processor that is configured with integration model code for executing an integration model. The processor is configured to integrate various software systems by establishing a connection to an enterprise resource planning system and exchange information between the plant process and a business process such that production data are received from the processes substantially in real time and an updated status of a production order is received continuously. The integration model includes placeholders associated with variables for at least one of events, devices and plants, placeholders associated with functions to be executed, functionalities which link the variables and call up the functions, mappings of parameters between the software systems to be linked, and requests for loading information from one software system to another. | 03-28-2013 |
20130191176 | METHOD AND DEVICE FOR CO-ORDINATING TWO CONSECUTIVE PRODUCTION STEPS OF A PRODUCTION PROCESS - A method and apparatus are disclosed for coordinating two consecutive production steps of a production process including: a) devising a production schedule of a first manufacturing stage according to a first optimization target based on one or more first optimization parameters, in order to obtain a first optimization result; b) devising a production schedule of a second manufacturing stage according to a second optimization target based on one or more second optimization parameters, in order to obtain a second optimization result; c) assessing the optimization results with regard to an overall optimization target; d) modifying the first and second optimization parameters; and e) repeating the process of devising the production schedules of the first and second manufacturing stages according to the respective optimization target based on the modified first and/or second optimization parameters. | 07-25-2013 |
20140180741 | SYSTEM AND METHOD FOR AUTOMATIC ALLOCATION OF MOBILE RESOURCES TO TASKS - A system for automatic allocation of mobile resources to tasks includes at least one database which stores for each mobile resource at least one corresponding skill and equipment as well as street-level data defining roads between a current location of the mobile resources and the distant locations of the tasks, and dynamic data which have a potential impact on performance of the tasks. A first data processing unit allocates the mobile resources to the tasks by allocating the skills to the tasks and the equipment, and generates for at least one of the mobile resources an individual schedule including a street-by-street route along the roads to the respectively allocated tasks. A second data processing unit continuously pre-processes the dynamic data to determine which of the street-level data, the mobile resources and the tasks are affected by the dynamic data and to what extent, and to amend the affected data accordingly. | 06-26-2014 |