Inventors list |
Assignees list |
Classification tree browser |
Top 100 Inventors |
Top 100 Assignees |
Hong-Yih
Hong-Yih Yeh, Xiridian City TW
| Patent application number | Description | Published |
|---|---|---|
| 20110082679 | Apparatus of simulating data certification with safe network communication - The present invention provides a simulation. In the present invention, a hardware simulation is replaced with a software simulation. Hence, with the software simulation, cost for buying hardware is saved. At the same time, system functions are effectively certified in a limited time. And speed, quality and safety on testing system modules are thus improved. | 04-07-2011 |
Hong-Yih Yeh, Longtan Shiang TW
| Patent application number | Description | Published |
|---|---|---|
| 20100275903 | Solar tracker - A solar tracker includes a sunlit-detecting unit, a control unit, a first motor and a second motor. The sunlit-detecting unit detects the position of the sun. Based on the position of the sun, the control unit instructs the first motor to rotate a solar cell array and the second motor to tilt the solar cell array. | 11-04-2010 |
| 20110023865 | Horizontal Solar Tracker Apparatus - A horizontal solar tracker is provided for solar tracker and solar moduli. The horizontal solar tracker uses a truss device to enhance bending moment endurance. The truss device has good stress strength. Thus the present invention can resist deformation. | 02-03-2011 |
Hong-Yih Yeh, Sindian City TW
| Patent application number | Description | Published |
|---|---|---|
| 20090106001 | Digital I&C software failure simulation test facility - A test facility is obtained for software failure simulation. The test facility applies new failure modes related to software safety analysis and deduction. It is done by integrating a nuclear power plant simulation facility and a high pressure core flooder control facility. And the integration is done through a hardware I/O module and a quality guarantee network. | 04-23-2009 |
