Inventors list |
Assignees list |
Classification tree browser |
Top 100 Inventors |
Top 100 Assignees |
Giebels
Marc Marinus Johannes Leonardus Giebels, Geldrop NL
| Patent application number | Description | Published |
|---|---|---|
| 20110005371 | Device and Method for Braiding Fibers into a Braided Structure - The invention relates to a device for braiding fibers into a braided structure, the device comprising a braiding machine, comprising a continuous track plate, a forming device, comprising a forming ring, a braiding mandrel about which the braiding machine braids at least one layer of the braided structure, and positioning means to effectuate relative movement of the mandrel and the braiding machine during braiding. The continuous track plate and/or the forming ring are build up of at least two parts that may be separated and reattached to each other, the parts being arranged such as to allow the track plate and/or the forming ring to enclose the mandrel. The invention further relates to a method for braiding fibers into a braided structure. | 01-13-2011 |
Mark Mathieu Theodorus Giebels, Wageningen NL
| Patent application number | Description | Published |
|---|---|---|
| 20100057240 | METHOD FOR UPDATING MANUFACTURING PLANNING DATA FOR A PRODUCTION PROCESS - Manufacturing planning data for a production process that is managed by a manufacturing execution system is updated by way of a plurality of steps, which include: Gathering data from a PLC level relevant to the manufacturing planning data and the execution of the production process; mapping the gathered data with the current manufacturing planning data in order to determine suggested changes between the gathered data and the current manufacturing planning data; applying a predetermined update scenario for the manufacturing planning data depending on the suggested changes to update the manufacturing planning data; and adapting the current production process and optionally following production processes according to the updated manufacturing planning data. The reliability of the so-called standard data used in production planning processes is thus dramatically improved. Furthermore, since trends on possible deviations from the standard data can be recognized in real-time, it is now possible to dynamically update the standard data as soon as accompanying quality improvement programs reach those performance results which are significant for the current production plan based on the production planning data. | 03-04-2010 |
Mark Mathieu Theodorus Giebels, Genova IT
| Patent application number | Description | Published |
|---|---|---|
| 20090005895 | Method to imporove the performance of a distrubuted scheduler - To improve the performance of a distributed scheduler for a manufacturing process comprising activities including a production resource management, a production definition management, and a detailed production scheduling, a method provides a decision and prediction function over the activities which carries out an analysis of a variability of the manufacturing process. Further, the method takes results of the analysis into account while making an actual detailed schedule in the production scheduling. | 01-01-2009 |
