Patent application number | Description | Published |
20080223046 | Method for providing auxiliary power to an electric power plant using fischer-tropsch technology - A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates. | 09-18-2008 |
20090062108 | STRENGTHENED IRON CATALYST FOR SLURRY REACTORS - A method of strengthening a precipitated unsupported iron catalyst by: preparing a precipitated unsupported iron catalyst containing copper and potassium; adding a solution comprising a structural promoter to the previously prepared catalyst; drying the mixture; and calcining the dried catalyst. | 03-05-2009 |
20090069451 | PRECIPITATED IRON CATALYST FOR HYDROGENATION OF CARBON MONOXIDE - A method of producing an iron catalyst for catalyzing the hydrogenation of carbon monoxide is disclosed. The method comprises using a reduced amount of acid for iron dissolution compared to certain previous methods. The resulting acidic iron mixture is heated without boiling to obtain a nitrate solution having a Fe | 03-12-2009 |
20090111684 | METHOD FOR ACTIVATING STRENGTHENED IRON CATALYST FOR SLURRY REACTORS - A method of activating an iron Fischer-Tropsch catalyst by introducing an inert gas into a reactor comprising a slurry of the catalyst at a first temperature, increasing the reactor temperature from the first temperature to a second temperature at a first ramp rate, wherein the second temperature is in the range of from about 150° C. to 250° C., introducing synthesis gas having a ratio of H | 04-30-2009 |
20100109338 | METHOD FOR PROVIDING AUXILIARY POWER TO AN ELECTRIC POWER PLANT USING FISCHER TROPSCH TECHNOLOGY - A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates. | 05-06-2010 |
20100152036 | PRECIPITATED IRON CATALYST FOR HYDROGENATION OF CARBON MONOXIDE - A method of producing an iron catalyst for catalyzing the hydrogenation of carbon monoxide is disclosed. The method comprises using a reduced amount of acid for iron dissolution compared to certain previous methods. The resulting acidic iron mixture is heated without boiling to obtain a nitrate solution having a Fe | 06-17-2010 |
20100152307 | PRECIPITATED IRON CATALYST FOR HYDROGENATION OF CARBON MONOXIDE - A method of producing an iron catalyst for catalyzing the hydrogenation of carbon monoxide is disclosed. The method comprises using a reduced amount of acid for iron dissolution compared to certain previous methods. The resulting acidic iron mixture is heated without boiling to obtain a nitrate solution having a Fe | 06-17-2010 |
20110211996 | METHOD AND APPARATUS FOR REGENERATING AN IRON-BASED FISCHER-TROPSCH CATALYST - Solvent extraction is used to remove wax and contaminants from an iron-based Fischer-Tropsch catalyst in a natural circulation continuous-flow system. The wax-free catalyst is then subjected to controlled oxidation to convert the iron to its initial oxidized state, Fe | 09-01-2011 |
20120153639 | METHOD FOR PROVIDING AUXILIARY POWER TO AN ELECTRIC POWER PLANT USING FISCHER-TROPSCH TECHNOLOGY - A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates. | 06-21-2012 |