Inventors list

Assignees list

Classification tree browser

Top 100 Inventors

Top 100 Assignees


Barton Sponchia, Cypress US

Barton Sponchia, Cypress, TX US

Patent application numberDescriptionPublished
20090283263SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - A system for monitoring a location of a borehole for production of petroleum from an earth formation is provided. The system includes: an assembly including at least one of an injection conduit for injecting a thermal source into the formation and a production conduit for recovering material including the petroleum from the formation; a guide conduit attached to at least a portion of the at least one of the injection conduit and the production conduit, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; and a detection source conduit insertable through the guide conduit and configured to dispose therein a detection source for detecting a location of the assembly in the formation. A method of monitoring a location of a borehole for production of petroleum from an earth formation is also provided.11-19-2009
20090283264SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - A system for production of petroleum from an earth formation is provided. The system includes: at least one injection borehole for injecting a thermal source into the formation; at least one production borehole for recovering material including the petroleum from the formation; and at least one drainage borehole intersecting a portion of the at least one production borehole. Methods of recovering petroleum from an earth formation and creating a petroleum production system are also provided.11-19-2009
20090283267SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - A system for production of petroleum from an earth formation. The system includes: an injection assembly disposable within a first borehole for injecting a thermal source into the formation, the injection assembly including an injector extending from a distal end of the assembly; and a production assembly disposable within a second borehole for recovering material including the petroleum from the formation, the production assembly including a collector extending from a distal end of the assembly. At least one of the injector and the collector includes at least a first conduit and at least a second conduit concentric with the first conduit, the first conduit having a first distal end and the second conduit having a second distal end, the first and second distal ends located at different locations along a length of at least one of the first and second borehole.11-19-2009
20090283268SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - A system for production of petroleum from an earth formation includes: an injection assembly disposable within a first borehole for injecting a first thermal source into the formation, the injection assembly including an injector extending from a distal end of the assembly; a production assembly disposable within a second borehole for recovering the petroleum from the formation, the production assembly including a production conduit and a collector extending from the distal end of the assembly; and a thermal injection conduit extending through at least a portion of the production conduit and the collector for regulating a thermal property of the petroleum.11-19-2009
20090284260SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - An apparatus for monitoring a location of a borehole for production of petroleum from an earth formation is provided. The apparatus includes: a detection source disposable within a detection source conduit, the detection source including an elongated electrically conductive member extendable along at least a portion of the detection source conduit; and an electrosensitive material disposed in at least one portion of the elongated member, the electrosensitive material reactive to an electric current to change a shape of the electrosensitive material, the electrosensitive material configured to change shape in response to the electric current to form an electromagnet at the portion. A system and method for monitoring a location of a borehole for production of petroleum from an earth formation are also provided.11-19-2009
20110056680SYSTEMS, METHODS AND APPARATUSES FOR MONITORING AND RECOVERY OF PETROLEUM FROM EARTH FORMATIONS - A system for monitoring a location of a borehole for production of petroleum from an earth formation is provided. The system includes: an assembly including at least one of an injection conduit for injecting a thermal source into the formation and a production conduit for recovering material including the petroleum from the formation; a guide conduit attached to at least a portion of the at least one of the injection conduit and the production conduit, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; and a detection source conduit insertable through the guide conduit and configured to dispose therein a detection source for detecting a location of the assembly in the formation. A method of monitoring a location of a borehole for production of petroleum from an earth formation is also provided.03-10-2011
20110114320STAND-ALONE FRAC LINER SYSTEM - A stand-alone frac liner that allows for fracturing of multiple lateral legs of a multilateral well on a single call out and rig-up of fracturing equipment. Tools and techniques are provided that include setting multiple stand-alone frac liners in multiple lateral legs of the multilateral well. The liners may rest in the legs physically untethered to surface equipment. Thus, a single call out of a frac string tubular and associated equipment may be used to frac the lateral legs in sequence from one leg to the next. This may be achieved without the requirement of removal of the tubular from the well or disconnect of surface fracturing equipment between the lateral fracture applications. Thus, a considerable amount of expenses associated with time and manpower may be saved.05-19-2011
20110232063DIVERTING SYSTEM AND METHOD OF RUNNING A TUBULAR - A method of running a first tubular within a second tubular includes running the first tubular into the second tubular past at least one lateral extending from the second tubular, running a diverting tool at the first tubular with the running of the first tubular, withdrawing the first tubular from the second tubular until an end of the first tubular is beyond a junction between the at least one lateral and the second tubular and, running the first tubular into the at least one lateral.09-29-2011