| Patent application number | Description | Published |
| 20090084545 | METHOD FOR MANAGING PRODUCTION FROM A HYDROCARBON PRODUCING RESERVOIR IN REAL-TIME - The invention relates to a method of performing an oilfield operation of an oilfield having at least one wellsite, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include obtaining a plurality of real-time parameters from a plurality of sensors disposed about the oilfield, wherein the plurality of real-time parameters comprise at least one selected from a group consisting of real-time flow rate data and real-time pressure data of the wellbore, configuring a gridless analytical simulator for simulating the underground reservoir based on the plurality of real-time parameters, generating real-time simulation results of the underground reservoir and the at least one wellsite in real-time using the gridless analytical simulator, and performing the oilfield operation based on the real-time simulation results | 04-02-2009 |
| 20100155142 | SYSTEM AND METHOD FOR PERFORMING AN ADAPTIVE DRILLING OPERATION - A system and method for performing an adaptive drilling operation is provided. The method involves obtaining data prior to drilling, constructing a base model with a base model unit from data obtained prior to drilling, constructing an overburden posterior model with an overburden model unit using the base model and data obtained from overburden drilling, constructing a reservoir posterior model with a reservoir model unit using the overburden posterior model and the data obtained from reservoir drilling and updating drilling operation based on the models. | 06-24-2010 |
| 20100185427 | AUTOMATED FIELD DEVELOPMENT PLANNING - A system for automatically optimizing a Field Development Plan (FDP) for an oil or gas field uses a fast analytic reservoir simulator to dynamically model oil or gas production from the entire reservoir over time in an accurate and rapid manner. An objective function defining a Figure of Merit (FoM) for candidate FDPs is maximized, using an optimization algorithm, to determine an optimized FDP in light of physical, engineering, operational, legal and engineering constraints. The objective function for the Figure of Merit, e.g., net present value (NPV) or total production for a given period of time, relies on a production forecast from the fast analytic reservoir simulator for the entire FDP. The position, orientation and dimensions of analytical model elements for the subsurface oil or gas field, as well as the physical properties associated with these elements, correlate to connected flow volume data from a Shared Earth Model (SEM). Uncertainty in the SEM is considered via stochastic sampling. In the presence of uncertainty, the optimum Field Development Plan (FoM) is selected by maximizing an objective function defining a risk-based Figure of Merit for the entire FDP. | 07-22-2010 |
| 20110067857 | DETERMINING PROPERTIES OF A SUBTERRANEAN STRUCTURE DURING HYDRAULIC FRACTURING - A technique includes receiving, during a hydraulic fracturing operation in a subterranean structure, pressure data and fluid injection rate data. One or more properties of the subterranean structure are determined in real-time using the received pressure data and fluid injection rate data. | 03-24-2011 |
| 20120016649 | SYSTEM AND METHOD FOR CONTROLLING AN ADVANCING FLUID FRONT OF A RESERVOIR - A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan. | 01-19-2012 |