Inventors list

Assignees list

Classification tree browser

Top 100 Inventors

Top 100 Assignees


Banerjee, GB

Dev Kumar Banerjee, Hampshire GB

Dev Kumar Banerjee, Shirley GB

Patent application numberDescriptionPublished
20080315866Control system - A control system for use in safety critical human/machine control interfaces is described, more particularly a joystick type control system and particularly a joystick type control system utilizing magnetic positional sensing. The control system provides a control input device having a movable magnet, a pole-piece frame arrangement positioned about the magnet, at least three magnetic flux sensors being positioned in said pole-piece frame arrangement and a monitoring arrangement for monitoring the output signal of each of said at least three sensors.12-25-2008

Dev Kumar Banerjee, Southampton GB

Patent application numberDescriptionPublished
20120025809Control Device - A control device is provided configured to provide user control signals. The control device comprises a magnetic flux sensing unit configured to provide two-dimensional angular orientation information with respect to a magnetic field acting on the magnetic flux sensing unit, and the user control signals are dependent on the two-dimensional angular orientation information. The control device further comprises a magnet arrangement comprising at least two permanent magnets configured to generate the magnetic field. The magnet arrangement and the magnetic flux sensing unit are arranged to be reoriented relative to one another within a predetermined range of movement, and the at least two permanent magnets are arranged relative to the magnetic flux sensing unit such that the magnetic field experienced by the magnetic flux sensing unit is substantially uniform throughout the predetermined range of movement.02-02-2012

Raj Banerjee, Abingdon GB

Patent application numberDescriptionPublished
20090084545METHOD FOR MANAGING PRODUCTION FROM A HYDROCARBON PRODUCING RESERVOIR IN REAL-TIME - The invention relates to a method of performing an oilfield operation of an oilfield having at least one wellsite, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include obtaining a plurality of real-time parameters from a plurality of sensors disposed about the oilfield, wherein the plurality of real-time parameters comprise at least one selected from a group consisting of real-time flow rate data and real-time pressure data of the wellbore, configuring a gridless analytical simulator for simulating the underground reservoir based on the plurality of real-time parameters, generating real-time simulation results of the underground reservoir and the at least one wellsite in real-time using the gridless analytical simulator, and performing the oilfield operation based on the real-time simulation results04-02-2009
20100155142SYSTEM AND METHOD FOR PERFORMING AN ADAPTIVE DRILLING OPERATION - A system and method for performing an adaptive drilling operation is provided. The method involves obtaining data prior to drilling, constructing a base model with a base model unit from data obtained prior to drilling, constructing an overburden posterior model with an overburden model unit using the base model and data obtained from overburden drilling, constructing a reservoir posterior model with a reservoir model unit using the overburden posterior model and the data obtained from reservoir drilling and updating drilling operation based on the models.06-24-2010
20100185427AUTOMATED FIELD DEVELOPMENT PLANNING - A system for automatically optimizing a Field Development Plan (FDP) for an oil or gas field uses a fast analytic reservoir simulator to dynamically model oil or gas production from the entire reservoir over time in an accurate and rapid manner. An objective function defining a Figure of Merit (FoM) for candidate FDPs is maximized, using an optimization algorithm, to determine an optimized FDP in light of physical, engineering, operational, legal and engineering constraints. The objective function for the Figure of Merit, e.g., net present value (NPV) or total production for a given period of time, relies on a production forecast from the fast analytic reservoir simulator for the entire FDP. The position, orientation and dimensions of analytical model elements for the subsurface oil or gas field, as well as the physical properties associated with these elements, correlate to connected flow volume data from a Shared Earth Model (SEM). Uncertainty in the SEM is considered via stochastic sampling. In the presence of uncertainty, the optimum Field Development Plan (FoM) is selected by maximizing an objective function defining a risk-based Figure of Merit for the entire FDP.07-22-2010
20110067857DETERMINING PROPERTIES OF A SUBTERRANEAN STRUCTURE DURING HYDRAULIC FRACTURING - A technique includes receiving, during a hydraulic fracturing operation in a subterranean structure, pressure data and fluid injection rate data. One or more properties of the subterranean structure are determined in real-time using the received pressure data and fluid injection rate data.03-24-2011
20120016649SYSTEM AND METHOD FOR CONTROLLING AN ADVANCING FLUID FRONT OF A RESERVOIR - A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan.01-19-2012

Patent applications by Raj Banerjee, Abingdon GB

Raj Banerjee, Oxon GB

Patent application numberDescriptionPublished
20090260880Method for determining a set of net present values to influence the drilling of a wellbore and increase production - A method is disclosed for modeling a first reservoir while drilling a wellbore into a corresponding second reservoir, the first reservoir having a plurality of stations, comprising: determining a plurality of values of net present value corresponding, respectively, to the plurality of stations of the first reservoir; and drilling the wellbore into the corresponding second reservoir in accordance with the plurality of values of net present value.10-22-2009

Raj Banerjee, Oxfordshire GB

Patent application numberDescriptionPublished
20090114009METHOD FOR ANALYSIS OF PRESSURE RESPONSE IN UNDERGROUND FORMATIONS - A method of analysing a reservoir pressure in an underground formation surrounding a well, comprising: determining the permeability of mud cake on the wall of the well in the region in which the pressure measurement is made; determining the thickness of mud cake on the well of the well in the region in which the pressure measurement is made; determining the hydrostatic pressure in the well in the region in which the pressure measurement is made; measuring the formation pressure at the wall of the well; calculating a pressure decay index from the mud cake permeability and thickness, the hydrostatic pressure and the measured pressure; and using the pressure decay index to analyse the measured pressure to derive the reservoir pressure.05-07-2009