Patent application number | Description | Published |
20110106680 | TURBINE OPERATION DEGRADATION DETERMINATION SYSTEM AND METHOD - A system for creating a financial risk model for at least one turbine includes a database storing operational characteristics of one or more turbines and a processing module coupled to the database that receives information from the database and creates the financial risk determination. The processing module includes a performance degradation modeler that receives performance data and creates a model there from and a financial risk calculator coupled to the performance modeler that determines financial exposure to a contract based on the model received from the performance modeler. | 05-05-2011 |
20110106747 | TURBINE LIFE ASSESSMENT AND INSPECTION SYSTEM AND METHODS - A system for creating an inspection or part replacement recommendation for a unit forming a part of a fleet includes an assessment module that receives inputs from at least one portion of at least one turbine and produces an inspection recommendation. The assessment module includes a health assessment module that creates a risk of event estimate based on the inputs and historical operations data and a performance analyzer coupled to the health assessment module that creates the inspection or part replacement recommendation based on the risk of event estimate and information related to a cost. | 05-05-2011 |
20110211940 | SYSTEM AND METHOD FOR INSPECTION OF STATOR VANES - Embodiments of the invention include an inspection system to inspect internal components of a compressor of a gas turbine engine. The inspection system includes an image recording assembly having one or more image recording devices, light sources, storage devices, and power supplies. The image recording assembly may be inserted into a compressor without removal of the compressor housing or disassembly of the compressor. The image recording assembly may be removably coupled to a rotary component of the compressor, e.g., a rotor blade, and used to record images of stationary components, e.g., stator vanes, of the compressor. The images may be inspected to identify wear and/or defects in the stationary components, e.g., stator vanes | 09-01-2011 |
20110247418 | SYSTEM AND METHOD FOR MONITORING A COMPRESSOR - A system for monitoring compressor anomalies includes an acoustic energy detector connected to the compressor and a controller in communication with the acoustic energy detector. The acoustic energy detector transmits an acoustic energy signal reflective of acoustic energy produced by the compressor to the controller. At least one sensor connected to the compressor measures an operating parameter of the compressor and transmits a parameter signal reflective of the operating parameter to the controller, A method for monitoring compressor anomalies includes sensing acoustic energy produced by the compressor and transmitting an acoustic energy signal reflective of the acoustic energy to a controller. The method further includes sensing at least one operating parameter of the compressor, transmitting a parameter signal reflective of the operating parameter to the controller, and transmitting an output signal based on the acoustic energy signal and the operating parameter signal. | 10-13-2011 |
20110296810 | LIFE MANAGEMENT SYSTEM AND METHOD FOR GAS TURBINE THERMAL BARRIER COATINGS - A method, system and computer program product for life management and monitoring of a high temperature gas turbine including components having a thermal barrier coating is disclosed. The method, system and computer program product uses design, monitoring and diagnostics, and inspection data to determine the cumulative damage and remaining useful life of gas turbine components and unit risk and classification probability to determine thermal barrier coating damage probability, remaining useful life, and inspection recommendations. | 12-08-2011 |
20110320181 | TURBOMACHINE AIRFOIL LIFE MANAGEMENT SYSTEM AND METHOD - A system for creating a risk analysis for at least one turbomachine includes a database storing characteristics of one or more turbomachines and a processing module coupled to the database that receives the characteristics from the database and creates the risk analysis. The processing module includes a modeling module creates a representation of the amount of rocking in a particular turbomachine based on the characteristics and a performance modeler coupled to the modeling module and that, based on the representation of the amount of rocking, creates the risk analysis. | 12-29-2011 |
20120026306 | Image Recording Assemblies and Coupling Mechanisms For Stator Vane Inspection - A system is disclosed that includes an image recording assembly for recording images of a stator vane of a compressor and a mechanism configured to magnetically couple the image recording assembly to a rotor blade of a compressor. Additional systems are provided that include image recording assemblies. Methods implementing the disclosed systems are also provided. | 02-02-2012 |
20120136819 | TURBINE PERFORMANCE DIAGNOSTIC SYSTEM AND METHODS - A turbine performance diagnostic system creates a performance report for one or more turbines and includes an assessment module that receives operating data from at least one turbine and produces a performance report from the operating data. The assessment module includes a change detection module configured to determine when at least one parameter has changed beyond an associated threshold and generate an alarm and a root cause analyzer coupled to the change detection module that predicts a root cause of the alarm utilizing a Bayesian Belief Network (BBN). The performance report includes an indication of the predicted root cause. | 05-31-2012 |
20120161965 | METHOD AND SYSTEM FOR COMPRESSOR HEALTH MONITORING - A method for monitoring the health of a compressor of a gas turbine is disclosed. The method includes receiving a plurality of turbine data points, wherein the plurality of turbine data points may include one or more operating parameters, at least one of a computer discharge temperature (CTD), and one or more performance parameters. The plurality of turbine data points may be categorized based on the one or more operating parameters. A statistical variability measure of at least one of the CTD and the one or more performance parameters may be computed for each of the plurality of bands. An alarm indicator may be computed based on the at least one statistical variability measure. The method may also include combining two or more of the operating parameters, the CTD and the performance parameters using sensor fusion techniques. The alarm indicator may be computed based on the combined parameters. | 06-28-2012 |
20120260667 | Power Plant - A power plant is provided and includes a gas turbine engine to generate power, a heat recovery steam generator (HRSG) to produce steam from high energy fluids produced from the generation of power in the gas turbine engine, a steam turbine engine to generate additional power from the steam produced in the HRSG and a thermal load reduction system to reduce thermal loading of components of the HRSG and/or the steam turbine engine during at least startup and/or part load operations, which includes an eductor by which a mixture of compressor discharge air and entrained ambient air is injectable into the HRSG and/or an attemperator to cool superheated steam to be transmitted to the steam turbine engine and a detector disposed within the HRSG to facilitate identification of hot spots therein. | 10-18-2012 |
20120283885 | AUTOMATED SYSTEM AND METHOD FOR IMPLEMENTING STATISTICAL COMPARISON OF POWER PLANT OPERATIONS - Systems and methods for analyzing power plant data include accessing data for one or more monitored parameters, generating a continuous time-series profile model (e.g., by generalized additive model and/or principal curves techniques) of selected parameters during instances of at least one given type of power plant operation, and conducting shape analysis by comparing the continuous time-series profile model of selected monitored parameters to an entitlement curve representing ideal performance for the at least one given type of power plant operation. Data associated with the profile modeling and shape analysis techniques may be provided as electronic output to a user. Additional steps or features may involve determining a capability index for selected monitored parameters, clustering together identified groups of profile models having similar profiles, monitoring and/or optimizing parameters to identify and improve power plant performance. | 11-08-2012 |
20120283988 | AUTOMATED SYSTEM AND METHOD FOR IMPLEMENTING UNIT AND COLLECTIVE LEVEL BENCHMARKING OF POWER PLANT OPERATIONS - Systems and methods for implementing benchmarking analysis for power plant operations comprise electronically accessing power plant operational data within at least one type of operation within a power plant, electronically analyzing data from one or more power plant components within one or more different power plant units in one or more collections of multiple power plant units to identify cycles and key events on one or more of a component level, a unit level and a collective level of multiple power plants, generating at least one scorecard summary of calculated power plant operational characteristics on selected levels of operation comprising one or more of a component level, unit level and collective level of power plant units, and providing the at least one scorecard summary as electronic output to a user. Additional optional steps include using the data from the scorecard summary to detect outliers and/or to cluster selected components, units or fleets having similar operational characteristics. | 11-08-2012 |
20130024179 | MODEL-BASED APPROACH FOR PERSONALIZED EQUIPMENT DEGRADATION FORECASTING - A system, in one embodiment, provides means for acquired measurements of one or more operating parameters of a turbine engine. The system further includes means for determining an estimated value of a performance parameter of interest at a current time based at least partially upon the acquired measurements, means for adjusting a deterioration model at the current time based on a historical set of estimated values from previous times, and means for forecasting performance changes in the turbine engine based on the adjusted deterioration model. | 01-24-2013 |
20130131951 | SYSTEM AND METHOD OF MONITORING TURBINE ENGINES - A monitoring system for use with a turbine engine is described herein. The turbine engine includes a compressor and at least one compressor bleed valve coupled to the compressor. The monitoring system includes at least one sensor that is for sensing an operational parameter of the compressor bleed valve, and a controller that is coupled to the sensor and the compressor bleed valve. The controller is configured to determine an operating mode of the turbine engine and receive a monitoring signal indicative of the sensed operational parameter. The controller is also configured to calculate at least one operational value of the compressor bleed valve based at least in part on the sensed operational parameter. The controller is further configured to determine a condition of the turbine engine based at least in part on the calculated compressor bleed valve operational value. | 05-23-2013 |
20130138937 | Method And System For Managing Plant Operation - Disclosed herein are methods and systems for advising and operating a power plant and related devices. In an embodiment, a power plant operator via a client | 05-30-2013 |
20130173231 | SYSTEM AND METHOD FOR FORMING FAILURE ESTIMATES FOR A HEAT RECOVERY STEAM GENERATOR - A method of forming a failure estimate for one or more components of a heat recovery steam generator (HRSG) includes forming from failure models and at least one of fired hours and fired starts, factored hours and factored starts. The factored hours and/or starts are applied to failure equations for the one or more components to form the failure estimate. | 07-04-2013 |
20140052426 | SYSTEM AND METHOD TO MANAGE CONDENSATE FORMATION - A system and method control condensate formation within headers of a heat recovery steam generator (HRSG) in a power generation facility. The system includes measurement devices to measure first parameters including pressure at respective first locations within the power generation facility. A model estimates second parameters at second locations within the power generation facility. A prediction model outputs a prediction of time of condensate formation on each of the headers based on the first parameters and the second parameters, and a controller controls the condensate formation based on the prediction. | 02-20-2014 |
20140244567 | SYSTEMS AND METHODS FOR PREDICTION OF TRIPS - A system is disclosed. The system includes a processing subsystem that receives component data signals corresponding to a plurality of parameters of a device, wherein the processing subsystem generates one or more sets of state category component data by allocating the component data signals into respective one or more sets of state category component data, determines a plurality of first dynamic thresholds and a plurality of second dynamic thresholds corresponding to at least one of the one or more sets of state category component data based upon a respective set of state category component data in the one or more sets of state category component data and a respective parameter in the plurality of parameters, and determines an impending trip of the device utilizing the plurality of first dynamic thresholds and the plurality of second dynamic thresholds. | 08-28-2014 |
20140257526 | PLANT CONTROL SYSTEMS AND METHODS - Systems and methods provided herein. In one embodiment, a system includes an advisory system including a loss computation engine configured to derive a total system loss for an industrial plant based on a first sensor positioned in a first industrial plant component and on a first physical model of the first industrial plant component. The advisory system further includes a cost model configured to use a cost function to derive a cost based on the total system loss, and a control strategy system configured to derive an advisory report, a control correction factor, or a combination thereof, based on the cost, wherein a control system is configured to apply the control correction factor to control a process in the industrial plant. | 09-11-2014 |
20150020530 | GAS TURBINE EMISSIONS CONTROL SYSTEM AND METHOD - Embodiments of the present disclosure are directed towards a system including a gas turbine engine, a selective catalytic reduction system, and a control system configured to regulate operation of the selective catalytic reduction system based at least partially on preset variations in an emissions compound of exhaust gases produced by the gas turbine engine. | 01-22-2015 |
20150058090 | Systems and Methods for Generating Solution Recommendations for Power Plant Operation - Systems and methods for generating solution recommendations for power plant operation can be provided by certain embodiments of the disclosure. In one embodiment, a system may include a processor configured to collect power plant operational data from power plant components. The power plant operational data may be analyzed to identify cost factors for the power plant components. Based at least in part on the power plant operational data and the cost factors, upgrade opportunities for the power plant components may be determined. Financial values may be calculated for the upgrade opportunities. Based at least in part on the financial values, recommendations may be generated using a product interaction database and provided as an electronic output to a user. | 02-26-2015 |