Patent application number | Description | Published |
20090082949 | METHOD AND SYSTEM FOR AUTOMATICALLY DIRECTING TRAFFIC ON A SITE - In a method for automatically directing traffic on a site, information is received regarding a plurality of selected entities on the job site. An indication of a first priority assigned to a first of the plurality of selected entities is received. An indication of a second priority assigned to a second of the plurality of selected entities is received. It is then determined that the first of the plurality of selected entities has a right of way over the second of the plurality of selected entities based upon a comparison of the first priority and the second priority. | 03-26-2009 |
20090083100 | Collision avoidance - In a method for avoiding a collision on a job site, information is received regarding a plurality of selected entities on the job site. The information is received at a location independent from the entities. The information is evaluated to determine whether a trigger has occurred. The trigger is associated with a potential collision situation involving an entity of the entities. A collision alert message is issued for the entity if the trigger has occurred. | 03-26-2009 |
20100138266 | MANAGEMENT OF MATERIALS ON A CONSTRUCTION SITE - A computer implemented method and computer system for management of materials on a construction site. In one embodiment, at least one cost scenario is defined for moving at least one material with a vehicle pool. A status of a project which uses the material is then determined. A report is generated which identifies a vehicle of the vehicle pool and defines a load of the material which is to be moved by the vehicle from a first location to a second location. | 06-03-2010 |
20110087662 | VISUAL ORGANIZATION OF INFORMATION VIA ASSOCIATED GEOSPATIAL DATA - In a method of organizing information, a plurality of diverse data items is accessed. The diverse data items are related to a physical location. The diverse data items that are accessed comprise at least a non-visual data item and a visual imagery data item, and include geospatial data associated with the individual accessed data items. The diverse data items are parsed by data type and stored in a data store such that the diverse data items are accessible by one or more of the geospatial data associated with the individual data items. Diverse data items related to the physical location are processed to produce an integrated image displayable via a web viewer. The processing occurs in response to receiving a request regarding the physical location. The integrated image comprises an integration of at least two of the stored diverse data items. | 04-14-2011 |
20110295496 | METHOD AND SYSTEM FOR AUTOMATICALLY DIRECTING TRAFFIC ON A SITE - In a method for automatically directing traffic on a site, information is received regarding a plurality of selected entities on the job site. An indication of a first priority assigned to a first of the plurality of selected entities is received. An indication of a second priority assigned to a second of the plurality of selected entities is received. It is then determined that the first of the plurality of selected entities has a right of way over the second of the plurality of selected entities based upon a comparison of the first priority and the second priority. | 12-01-2011 |
20130024245 | MANAGEMENT OF MATERIALS ON A CONSTRUCTION SITE - In a computer implemented method for management of materials on a construction site, a status of a project which uses at least one material is determined by a computer system. A report is generated by the computer system. The report identifies a vehicle, from a vehicle pool, to be utilized to move the material and defines a load of the material which is to be moved by the vehicle, according to a mass haul plan, from a first location to a second location. The vehicle is identified based on results of a simulation. The status of the project is automatically updated by the computer system based on an actual size and an actual drop-off location of the load of the material moved by the vehicle. The computer system updates the report based on the updating of the status of the project. | 01-24-2013 |