Mukadam
Fatema Mansoor Mukadam US
Patent application number | Description | Published |
---|---|---|
20100312837 | Methods and systems for determining email addresses - Disclosed herein is a method and system for a user to find an email address using the Internet. The user inputs the information that he wants to be verified or completed. A seeking unit determines the missing fields in the input information. The seeking unit may determine the missing information in the email address from various sources on the Internet, using a set of rules. The rules may be specified by the user or present in the database. The obtained search results are ranked by a ranking unit, based on the relevance of the scores. The seeking unit may also display the found email information along with the ranks to the user. The user has the option to sort the email information. The user may then select the most accurate email information, according to him, which is then used to populate the field in the information. | 12-09-2010 |
Hasham Mukadam, Los Angeles, CA US
Patent application number | Description | Published |
---|---|---|
20090252659 | METHOD AND APPARATUS FOR FLUE GAS TREATMENT - A method for flue gas treatment includes causing a combustion in a boiler using at least a part of a flue gas emitted from a gas turbine and introduced from at least one of an upstream side and a downstream side of an exhaust heat recovery boiler, which recovers a high-temperature heat of the flue gas, so as to increase a concentration of carbon dioxide in the flue gas, and recovering carbon dioxide in a carbon dioxide recovery apparatus. | 10-08-2009 |
Samir Mukadam, San Ramon, CA US
Patent application number | Description | Published |
---|---|---|
20150278736 | FRAMEWORK TO OPTIMIZE THE SELECTION OF PROJECTS AND THE ALLOCATION OF RESOURCES WITHIN A STRUCTURED BUSINESS ORGANIZATION UNDER TIME, RESOURCE AND BUDGET CONSTRAINTS - Aspects of the present disclosure are presented for efficiently allocating resources to projects in a schedule under time, resource and budget constraints. In some embodiments, a method is presented. The method may include accessing variables for determining an efficient allocation of resources in the schedule, including a set of project dependency values indicating which projects in the plurality of projects must be completed as requisite for completing other projects in the plurality of projects. The method may also include determining a dependency path indicating an ordering of projects to be completed, based on the set of project dependency values, wherein a project in the dependency path cannot be started until all preceding projects in the dependency path are completed; and determining an efficient selection of projects to be completed within the time horizon that maximizes an optimization goal, based on the dependency path and constrained by budget expenditures. | 10-01-2015 |