Class / Patent application number | Description | Number of patent applications / Date published |
700102000 | Job release determination | 10 |
20090118854 | PRODUCTION PLANNING SUPPORT METHOD AND ITS SYSTEM - A production planning support method and a system thereof are disclosed, wherein in order to facilitate the change in the production plan to suppress the inventory increase, the future timing to order the parts with an increased order amount and the quantity of the parts already ordered for the production planning amount at a given timing are grasped in advance. The feature of the invention lies in that the part order timing information is collected for each order timing and converted into the amount of money thereby to calculate the order amount for each order timing. The result is formed into graphs, so that the production planning amount at a given timing and the order amount required for the parts to meet the production plan collectively shown for each period are presented as juxtaposed graphs to the user. | 05-07-2009 |
20090143888 | METHOD AND SYSTEM FOR PRODUCT PROJECTION ANALYSIS - Disclosed is a method and system for generating a projection result of a product quantity. The generation of the projection result involves generating a product group for the product quantity by extracting a first partial product group from an actual output and extracting a second partial product group from an actual input, generating the projected result for the product quantity by moving the product group from a first production phase to a second production phase and outputting the projected result for the product quantity. | 06-04-2009 |
20090299511 | METHOD OF RELEASING UNITS IN A PRODUCTION FACILITY - A method of releasing units in a production facility includes forming a release plan for a production facility that establishes a number of units to be operated on by a production process, and creating a least one recipe bucket having an associated number of units. The method further requires evaluating production process throughput parameters, and comparing the number of units associated with the at least one recipe bucket with the number of units to be operated on by the production process and production process throughput parameters. If the number of units in the recipe bucket matches the number of units to be operated on by the production process and production process throughput parameters, recipe bucket is released to the production process, else the at least one recipe bucket is delayed from being released to the production process. | 12-03-2009 |
20100241263 | SYSTEM AND METHOD OF MULTI-OBJECTIVE CAPACITY PLANNING IN TFT-LCD PANEL MANUFACTURING INDUSTRY - A system and a method of multi-objective capacity planning in the TFT-LCD panel manufacturing industry are provided. The system includes a capacity planning module and a multi-objective planning module. In the present method, a capacity planning plan corresponding to different objective is evaluated by the capacity planning module. A set of constraints of each objective is established by the multi-objective planning module according to characteristic parameters, so as to optimize the objective. Then, the optimized objectives are drawn into a graph to select an appropriate capacity planning plan. | 09-23-2010 |
20100249971 | COMPONENT MOUNTING CONDITION DETERMINATION METHOD - Provided is a component mounting condition determination method of a component mounter ( | 09-30-2010 |
20100312372 | SYSTEM AND METHOD FOR PLANNING GLOBAL LOGISTICS IN TFT-LCD MANUFACTURING INDUSTRY - A system and a method of planning global logistics for a TFT-LCD manufacturing industry are provided. The system includes an input module and an industry characteristic planning module with a front-end process transformation module and a back-end transportation allocation module. The input module is used for selecting a performance index and inputting related parameters such as manufacturing parameters and shipping parameters. The front-end process transformation module calculates the number of each semi-finished product at each of the front-end TFT-LCD manufacturing factories so as to estimate an glass substrate input quantity for each respective front-end TFT-LCD manufacturing factory. The back-end transportation allocation module calculates a shipping quantity of the semi-finished products shipped from each front-end TFT-LCD manufacturing factory to each back-end LCM factory, and calculates the number of semi-finished products received from each front-end TFT-LCD manufacturing factory in each back-end LCM factory. | 12-09-2010 |
20100332007 | Scheduling Method and System for Synchronization of Material Flows in Batch Process Industry - Method for managing material flows synchronization in a batch manufacturing process including a plurality of activities includes: representing the material flow between each of any two of the connected activities by a pegging arc, where a source activity is supplying at least a portion of an associated quantity of the material to a target activity, where the quantity represents at least a portion of an associated quantity of the material; assigning to each pegging arc an order; following the assigned order, determining, for each pegging arc a speed C | 12-30-2010 |
20110040399 | APPARATUS AND METHOD FOR INTEGRATING PLANNING, SCHEDULING, AND CONTROL FOR ENTERPRISE OPTIMIZATION - A method includes receiving first input data from one or more first process control system components. The method also includes receiving second input data from one or more second process control system components. In addition, the method includes performing an iterative process that includes identifying one or more adjustments to at least one target quantity using the first input data, identifying one or more contribution values using the one or more adjustments, and identifying one or more estimated product yields using the one or more contribution values and the second input data. Each target quantity is associated with at least one intermediate or final product to be produced. Each contribution value is based on an intermediate product's contribution to each of multiple final products. Each estimated product yield is associated with an expected quantity of one of the intermediate and final products to be produced. | 02-17-2011 |
20110251708 | METHOD FOR PLANNING PRODUCTION SCHEDULE OF EQUIPMENT AND ASSOCIATED COMPUTER READABLE MEDIUM - A method for planning a production schedule of equipment includes: receiving information about a material replacement of the equipment; and determining a target production schedule of the equipment according to the information about the material replacement of the equipment, wherein the target production schedule includes an idle period, and during the idle period, the equipment stops manufacturing under a normal state. | 10-13-2011 |
20140058549 | MOULD MANUFACTURING CONTROL SYSTEM - Embodiments of the invention provide methods, systems, computer programs and the like that provide for mould manufacturing control. Embodiments of the invention employ management communication and integration amongst a plurality of devices or process stations included in a lineal moulding manufacturing process. Once customer orders are received, the orders are analyzed by a manufacturing application server and used to create job instructions for producing the one or more orders. The job instructions are then transmitted to one or more production device(s). The production devices execute the job instructions and report back to the server. The server maintains status information for any jobs being performed and can provide real time information regarding the jobs to any of the production devices. | 02-27-2014 |