Inventors list |
Assignees list |
Classification tree browser |
Top 100 Inventors |
Top 100 Assignees |
PTT EXPLORATION AND PRODUCTION PUBLIC COMPANY LTD.
| PTT EXPLORATION AND PRODUCTION PUBLIC COMPANY LTD. Patent applications | ||
| Patent application number | Title | Published |
|---|---|---|
| 20110132593 | SYSTEM, APPARATUS, AND METHOD FOR PRODUCING A MULTIPLE ZONES WELL - The present invention relates to a system, apparatus, and method provided to selectively produce petroleum fluid from multiple production zones well. The apparatus comprises a casing running downwardly into the well and a tubing string running in the casing. The upper and lower sealing mechanisms are provided for sealing the annular space between the casing and the tubing string, therefore, dividing the well into upper and lower production zones. Moreover, the invention comprises a bypass gaslift system provided with a tubular member, tubing string, connecting means and side pocket mandrels for injecting lifting gas into the multiple production zones well. The system and apparatus according to this invention can selectively operate to simultaneously or separately produce petroleum fluid from vertical apart multiple zones well. | 06-09-2011 |
| 20100032153 | BYPASS GAS LIFT SYSTEM AND METHOD FOR PRODUCING A WELL - A completion system delivers lifting gas supplied from the surface via a casing annulus through the packer for injecting to the wellbore at bottom hole. So, lifting gas maximizes hydrocarbon producing from a subterranean well while maintaining integrity and serviceability as a typical gas lift well. More specifically, a single completion system uses the same tubing string for both producing the well and delivering lifting gas to the wellbore at downhole. The top section of the tubing is used for producing the well, while the bottom section of the tubing is used for delivering lifting gas for injecting at bottom hole. The lifting gas will be injected to the wellbore proximately at perforation intervals for helping unloading liquid and producing the well. The use of modified equipment named “TK Bypass Mandrel” and “JP Bypass Nipple Sub” allows delivering and controlling of the lifting gas for injecting at bottom hole via a single tubing string. | 02-11-2010 |
