Inventors list

Assignees list

Classification tree browser

Top 100 Inventors

Top 100 Assignees


EDSA CORPORATION

EDSA CORPORATION Patent applications
Patent application numberTitlePublished
20100049494METHOD FOR PREDICTING POWER USAGE EFFECTIVENESS AND DATA CENTER INFRASTRUCTURE EFFICIENCY WITHIN A REAL-TIME MONITORING SYSTEM - A system for making real-time predictions about power usage efficiency (PUE) and/or data center infrastructure efficiency (DCiE) of an electrical system comprises a data acquisition component communicatively connected to a sensor configured to acquire real-time data output from the electrical system; an analytics server communicatively connected to the data acquisition component and comprising a virtual system modeling engine configured to generate predicted data output for the electrical system using a virtual system model of the electrical system, an analytics engine configured to monitor the real-time data output and the predicted data output of the electrical system, and a PUE/DCiE simulation engine configured to use the virtual system model updated based in the real-time data to forecast the PUE/DCiE.02-25-2010