CABLE TO DIRECTOR FROM [DELETED] RE POWER CHANGEOVER SATISFACTORY

Created: 3/1/1963

OCR scan of the original document, errors are possible

'3 SA <TOR f2 MAR

DIRECTOR

pr it:

NO MITE ACTION

FLT TIMES RSINAST HAM. PUPPCSES TYPE III PLUS IMS. . GROSSGERCENT. POSER CHANGEOVER SATISFACTORY. AB CLIMB WAS KADE0 FT. UNS HERE MADE. NO INS ERROR WAS NOTED OVER TGT AREA * ON RUNHE ERRORM AND PROGRESSIVELY WORSE VITH AN ERROR OF AA MM ON RUN H. RADIO COMPASS WAS CHECKED DURIKG FLT ANDEGREES OUT OF PHASEERY GOOD SIGNAL RECEIVED. FINAL APPROACH WAS FLOWNTS, DUE TO SEVERE LOW LEVEL TUKB, DRAG CHUTE FAILED TO DEPLOY ON TOUCH DOWN. ACFT WAS ALLOWED TO GO ONTO

OVERRUN. CHUTE CAME OUT JUST

FRIOR TO STOPPING. ITROGEN SYSTEM WENT TO ZERO WHILE NBR TWO REMAINED FULL- XYGEN SYSTEMBSRS SHILEAS FULL.

ENDSS AGE

DATE:7

i

B'vyyt than Thir tsi-jNG officei; paCHarw. cwm

Original document.

Comment about this article, ask questions, or add new information about this topic: