OPERATIONAL READINESS OF THE OXCART SYSTEM

Created: 11/12/1965

OCR scan of the original document, errors are possible

APPROVED FOP RELEASE DATE: AUG 2CC7

TOP SFflflTT

OXCART

5

MEMORANDUM FOR: Director of Reconnaissance. CIA

Readiness of the

OXCART System

As of thism very pleased to announce that, in my judgment,2 aircraft, its technical intelligence sensors, and its operating detachment are operationally ready.

The detachment is manned, equipped, and highly trained.

The aircraft system is performing up to specifications with satisfying reliability and repeatability.

The only exception to original design goals is in range. Due to some as yet unexplainable phenomena at cruise conditions, now under investigation, there is approximately

eficiency in the original specified rango. Until this deficiency is eliminated, it will bo necessary to plan operations within the present demonstrated useable operational range.

. ledford

JACK C. LEDFORD Brigadier Genoral, USAF Director of Special Activities

cci DCI DDCI

VIA BYEMAN

YSTEM

OXCART TOP TF^nST

Original document.

Comment about this article, ask questions, or add new information about this topic: