COSTING OF DEPLOYED COMPLEX F ABM SYSTEM, (S-4151)

Created: 2/24/1972

OCR scan of the original document, errors are possible

SUBJECT

REFERENCE

Chief, S'

Costing of DeployedDM System, OSR

In accordance with your request cost estimates forABM support and operational facilities have beenare given. dollars and represent tbe cost ofand equipping similar facilities in the United Statesmethods and technology, at. prices, in Billions.

support facilitiesacn -support facilitiesen

usedasis for

the "tunate. Ihe housing and administrative support area at

. was costed, and an estimate made of the number of pcrsoa-iel based there. The assumption was made that the samef single (barracks) and family-type housing will exist as at well as the ancillary facilities located there The cost estimates

' re fleet Moscow-area zone and cliraacic cusc lacLors. lajuioyment to more remote areas would introduce additional, cost factors.

3- issile checkout$0

tv.* for the estimate is located at

^^J) The cost given for the building includes design,construction and equipment.

CiA HISTORICAL REVIEWELEASE AS SANfiiZtD

Copy No.f 10

U. Operational faculties similar toSupport

Facility foror

facility is assumed to2 missile facility

ond cne coat shown repreeents tho capital Investment In thehaveimilar cost6 mieslle facility byas suggestedthe costwarhead bunker, ono pad, ond one vehicle storage buildingtho cost of the control-type buildings, the mainbuilding, and the liquid propellent facility. 3ytbe Indicated cost reduction for an operationalhandle only half the number of missiles amounts to onlypercent.

iici-xnc Chief

Original document.

Comment about this article, ask questions, or add new information about this topic: