MEMORANDUM FOR: Chief,
Chief,
Chief,"
Cost of Modifications toilo
for9 ICBM
Memorandum from Chief,ated
pril4
1. Modification of silo Type HID for use with theCBM includes the following:
It is estimated that -this modification costsillion rubles).
2. Costs of construction hove been estimated in rubles using Soviet handbooks and the totals converted toollars ot the ratio for heavy industrial constructionubles per dollar. Descriptions of the silos and measurements were obtained fromwith personnel of OSR and published reports from Air Force, Foreign Technology Division, worksheets supporting this estimate are maintained in the filesM.