ESTIMATE OF COSTS, COMMUNICATIONS, PBSUCCESS (W/ATTACHMENTS)

Created: 1/11/1954

OCR scan of the original document, errors are possible

ROUTING AND RECORD SHEET

JAN4

and ma Project Officer have been fully briefed on PBSUCCESS, ita objectives and current operational plana. The Project Officer haa personally surveyed all areas of operations in the field prior to estimating conoo equipment andrequirements. Although there is some question aboutecoimriBnd that attached budget be approved subjoct to readjustments

based on operational developments to be covered by appropriate aasendraents to this budget estimate.

P/Ops

RYBAT

fficer deticnationt should be uied in the "TO" column. Under eachine should be drawn acqss.sheet and each comment numbered to correspond with the number In Each officer should inWalEhectnsufficient)

before further routing. This Routing and Record Sheet should be returned to Rpfiiitry.

Aw,.ft.

i tins'

secret

Officenited states government

TO hief, WHH4

PROM Asst. Director for Communications

SUBJECT: Estimate of Costs. Communications, PBSUCCESS

he following is an estimate of costs of communications equipment for the various phases of operation PBSUCCESS:

for Reproduction St udio, LINCOLN

Broadcast Equipment

Equipment to traingent radio

operators

J

Operational Equipment-(equipment forgent ROs,

tactical communications equipment, etc, J

TOTAL EQUIPMENT

he following is an estimate of costs for operation of the SCRANTON training unit;

er man, per day Monthly

and oil for jeep and

of

expenses for training area

personnel

purchases for training

TOTAL MONTHLY OPERATING COSTS $

Totalonths

J. The following is an estimate of costs for operation of the SHERWOOD Broadcast Unit:

0 per day, per man Monthly

and oil for jeeps and

for.er

per man

s

L 3

Monthly

of twoonthly per Jeep "

purchases for maintenance of unit "

Travel "

TOTAL MONTHLY OPERATING COSTS Totalonths operation

he following is an estimate of cost* of per diem for TDY offfice of Communications personneleriod of six0 per day;

Crypto/Tech assigned Lincoln

1 Technician assigned Lincoln

Engineers,Training Officer, SCRAN

from OC-X, various adio Opcntor,

TOTAL MONTHLY PER DIEM Total per diem,o.

he total compilation of costs for the various phases of communications is as follows:

Operation of SCRANTON Operation of SHERWOOD Per Diem

TOTAL

APPROVED:

C 3

Project Officer

Original document.