CABLE TO DIRECTOR FROM LINCOLN RE GUATEMALA 1954 COUP

Created: 2/11/1954

OCR scan of the original document, errors are possible

Bglfl EB ft

ROOT.

CITE: SLINC

I IBS O: DIR RYQAT PBSUCCESS

RE: *)

1. GRATIFIED OVER PROSPECTS PROVIDING SUCH SERVICE TO FIELD OPERATIONS SOON.

.2. FOR GUIDANCE HQS PLANNING RECOMMEND LCFLUTTER

PERATOR SHOULD BE PROPERLY DOCUMENTED AND BACKSTOPPED TO CARRY OUT FOREGOING. IF NOT CERTAIN OF BACKSTOPPING THEN SUGGEST GUAT BE ELIMINATED FROM CONSIDERATION.

3. OPERATOR SHOULD BE ASSIGNED TO LINC WHERE HE WOULD OPERATE UNDER THE DIRECTION OF PBSUCCESS CE OFFICER FROM WWU WOULO RECEIVE INSTRUCTIONS WHILE IN FIELD. BELIEVE LATTER ESSENTIAL FOR EFFICIENT UTILIZATION THIS SERVICE.

Original document.

Comment about this article or add new information about this topic:

CAPTCHA