DATE MAR 54
CLASSIFIED MESSAGE
REVIEWRELEASE AS SANITIZED
iwv't'c
CTION: INFO I
RECTOR LINCOLN
)
flte)
TO: DIR
RYBAT PBSUCCESS
AP 5k-
CITE: SLINC
OPERATIONAL PLANNING NECESSITATES MAXIMUM WEATHER FORECASTS TO ENSURE SUCCESS. ACTIONILL FALL WITHIN NORMAL RAINY SEASON. THEREFORE, IMPERATIVE AIR AND GROUND OPERATIONS BE SCHEDULED FOR BREAKS AND FAVORABLE PERIODS.
URGE AMD PLAN SOONEST TO PROVIOE LINC ALL AVAILABLE-WEATHER FORECAST DATA FOP THE MONTHS OF MAY AND JUNE.
WEATHERCONSIDERABLY DURING ABOVE PERIOD WITHIN THE TARGET AREA DEPENDING ON TERRAIN FEATURES, THUS VERYTO ATTAIN LOCAL FORECASTS FOR ABOVE AS COMPLETE AS POSSISLE FOR EACH OF THE NINE TARGETS.
U. FORECASTS TO INCLUDE ESTIMATES ON CEILINGS, VISIBILITY, CLOUO COVER, RAINFALL, MEANAY, NIGHT),HUUIDlTY, POSSIBLE GROUND FOGS, BMND DIRECTION AND VELOCITY, AND THUNDER-STOP MS.
5- REQUEST PROCEDURES SE CSTAOLlSHED FOP THE PROCURE'rfENT AND TRANSMITTAL OF THE FOHE30ING INFO WITH THE MINIMUM POSSlELE
k mar)
time lag, preparing for later stage developments wherein such info must oe forwarded by priority cable,
end of message
s
Original document.
Comment about this article, ask questions, or add new information about this topic: