CABLE TO DIRECTOR FROM LINCOLN RE GUATEMALA 1954 COUP

Created: 4/7/1954

OCR scan of the original document, errors are possible

iSAGs

APRr

-

ACTICW

IffFO

LINCOLN

m) CIA HISTORICAL REVIEW PROGRAM RELEASE IN FULL

03

llHfi tfiffiS (fB

SLINC

PBSUCCESS RYSAT PBCA30DSEtfQ FOR IMMEDIATE ACTION

i. EUE TO ENFORCED IELAY3 START INCLIGHTS ESTIMATE AIR SUPPORT rtlLL BE FIFTEEN DAYS BEHIND TIME TABLE SCHEEULE. TO INSURE COMPLET:CH OF AIR LIFT TO 'SET GROUND OPERATIONS SCHEDULE FOLLOWING ACTION REQUIRED:

A. INCREASE AIR LIFT CAPABILITIES TO INSUREERY OFARGOOUNDS) HIRING PERIODAY (SEE?.

" B. TOBOVE IILL REQUIRE ONE ADDITIONAL7 AMD ONE ADDITIONAL STERILE AIR CREW AVAILABLE AT FJHOPEFUL FOR OPFRATIOliS5 APRILECOND7 AVAILABLE FOR STANDBY. 7 AIRCRAFT.

Z. UNFORESEEABLE EELAYS CAUSED BY INDECISION DTFROGS, WSHOOFS AUTHORITIES. THIS INDECISION PROMPTED BY COJAWN'IST DISTURBANCES THROUGHOUT AREA. OiVBALL INC REVOLUTION TACTICS BY UNCONTROLLABLE OUTSIDE FORCES KtfAKD IMMEDIATE ACTION OUR PART

S

IT IS FORBIOOFN TOOPY OF THiS MESSAGE Copy Ho.

'/ APR 54

0)

PAGE

TO INSURE AIR LIFT OFNDITS PER TIME TABLE.

OVI DE- ADDITWNALRCRAFJ AHD CREW..

F MESSAGE

Original document.

Comment about this article or add new information about this topic:

CAPTCHA