CABLE FROM LINCOLN REQUESTING BACKGROUND FOR PLAN TO BLOW UP DIESEL FUEL TANKS

Created: 4/30/1954

OCR scan of the original document, errors are possible

cip

IN ItfhflU

TO: SGUAT

RYBAT PBSUCCESS

re: 9

s),

info: dir

cite: slinc

BLOW AND IGNITE REFERENCED TWO LARGESTTANKS. DETERMINE THRU STATION OR SEMANTIC FOLLOWING:

A. AT QUANTITY USUALLY STORED IN TANKS ANO It HAT IS USUAL FUEL LEVEL.

6- REPORT SECURITY PROBLEMS, LIGHTS, GUARDS, APPROACH, VISIBILITY. FENCING.

C. TERRAIN STUDY INDICATES SPILLED FUEL KILL RUN INTO UNPOPULATED RAINE IF FIREWALL BROKEN. CONFIRM. DESCRIBE FIREWALL SOTH TANKS INCLUDING CAPACITY.

I: ECTIVE THIS TARGET IS TOSIGNAL "COMMENCE OPERATi ONS *; SECONDARY, REDUCE THIRD, PROVIDE VISUAL SUBSTANCE TO SPECIALSIMULTANEOUSLY.

END OF MESSAGE