CIA HISTORICAL REVIEW PROGRAM RELEASE AS.SANITIZED
pasuccsss/aiBAT/
SIX
chiof of st.-tion,
Li'XOLH
Operational Sab Tank
FOR ONTRICH
Attaohed hereto ia sucpleiaont to sei instruction; to ba passed to OSTRICH.
mm
JlSOKe. C. DUNBAR
JCD/HOM/raa4
Attachaentsi
1 page ao above
Chart
t tta Ufl in dupl)ttn duultt #1
PB SUCCKS VRfBAT/^aSr
;.ab
switches adjacent to the nain railroad station
ADAM, These tw> switches (marked on the attached chart) are tho ones which control the traffic into tho station from the direction of either north or south. The destruction of those two switches will prevent any rail traffic fron entering or leaving the station.
Instructions: Place two pound charges into the actual switch nechanism (where tho rails join when tho switch is thrown). Placeive pound charge under the cechaniwn (oanual, alongside the track) ao that it will also be destroyed or wreckedanner to render it unusable. Place these entries and fuoe them so that they will fire at roughly the same time. Use non-electric caps andht them at approximately the name time, if personnel available. Information available indicates thatwitches are manually operated only.
Equipmentpounds TIT
on-electrict fuse pliers
roll tape, friction
knife
watch
The time for setting and firing the chargoa will be determined later. Approach to the target will probably have to be made from under tbe hill as noted on the chart. Thereuard house approximately as Indicated and undoubtedly no re guards will be present at the time.
Original document.
Comment about this article, ask questions, or add new information about this topic: