DATE
MAY 54
E
1
: DIRECTOR LINCOLN
ACTION:
WH (PBS))
INFO :
HISTORICAL REVIEW PROGRAM RELEASE IN FULL
pflceebitldl
CITE: SLINC
0 (INO: SGUAT RYBAT PBSUCCESS RE: )
REMINDED ALL AGENT RADIO OPS BEING COUNTEDCOUNTRY AND WILL BE CONTROLLED IN SAME MANNER. THERE
IS NEITHER TIME NOR NEED TO INVOLVE YOUR STATION TURING MOUNTING PERIOD EXCEPT TO EXTENT REQUIRED ALTHO ONCE ESTABLISHED YOU WILL BE PROVIEED PERTINENT DATA FOR POSSIBLE MONITORING OR OTHER USE. THUS YOUR CONFUSION MAY STEM FROM IMPATIENCE AS YOU WILL BEINSTRUCTED IF AND WHEN REQUIRED TO TAKE PARTICULAR ACTION.
HAVE REQUIRED NUMEROUS CHANGESIN MOUNTING RO'S. SCRANTON IS IN CHARGE OF SHERWOOD IS IN CHARGE OF PREPARING SIGNAL PLANS ANDTEGU IS IN CHARGE OF MOUNTING OPS. MATERIAL SENT GUATHELD PENDING INSTRUCTIONS FROM ONTRICH.
3- OF ROfS AND FINAL ASSIGNMENTS WILL BE FULLY CLARIFIED TO YOU ONCE DETERMINED ON IfJFO BASIS. FYI ROOW ENROUTE TO QUEZALTENANGO. NO SUPPORT REQUIRED FROM GUAT.
SEC/RET j
IT IS FORBIDDEN TOOPY OF THIS MESSAGE Copy no.
AY0
4. YOUR PATIENCE DURING THIS PERIOD IS NECESSARY AND BE ASSURED LINC IS MAKING EVERY EFFORT TO PROPERLY COORDINATE ALL OPERATIONS THROUGH SIX DIFFERENT COUNTRIES WHICH MAKES IT MANIFESTLY IMPOSSIBLE TELL EVERYONE EVERYTHING.
END OF MESSAGE
Original document.
Comment about this article, ask questions, or add new information about this topic: